The maintenance of PE equipment in China in July involved 16 production enterprises, which were divided by region: the capacity of Northeast China was 1.275 million tons/year; North China involved capacity 1.02 million tons/year; East China involves a production capacity of 650,000 tons/year; South China involves 1.34 million tons/year; In Northwest China, 1.96 million tons of production capacity is involved, with a total production capacity of about 6.245 million tons/year, and the loss of plant output is about 220,000 tons, an increase of 28,000 tons over the previous month (192,000 tons), and the loss of plant maintenance is still at a relatively high level.

in July China PE device maintenance situation summary

petrochemical name

stop reason

parking time

drive time

maoming petrochemical

the density of 220000 tons/year

plan maintenance

2021-6-27

2021-7-13

maoming petrochemical

the density of 220000 tons/year

plan maintenance

2021-7-18

2021-7-28

maoming petrochemical

2 # LDPE 25 tons/year

a temporary repair

2021-7-8

2021-7-11

maoming petrochemical

2 # LDPE 25 tons/year

a temporary repair

2021-7-13

2021-7-16

extended coal issue of

HDPE 300000 tons/year

plan maintenance

2021-6-28

2021-7-12

extended coal phase ii

HDPE 300000 tons/year

on July 21, overhaul

2021-7-21

drive time pending

jilin petrochemical

LLDPE 275000 tons/year

plan maintenance

2021-6-4

2021-7-21

jilin petrochemical

HDPE 300000 tons/year

plan maintenance

2021-6-1

2021-7-22

lanzhou petrochemical

60000 tons/year old full density

plan maintenance

2021-6-4

2021-7-3

lanzhou petrochemical

60000 tons/year old full density

a temporary repair 2 days

2021-7-13

2021-7-15

lanzhou petrochemical

HDPE a line of 70000 tons/year

a temporary repair 2 days

2021-7-22

2021-7-25

lanzhou petrochemical

HDPE second line 100000 tons/year

a temporary repair 2 days

2021-7-19

2021-7-21

lanzhou petrochemical

LDPE 200000 tons/year

a temporary repair 3 days

2021-7-25

2021-7-28

qilu petrochemical

LDPE 140000 tons/year

maintenance on July 7

2021-7-7

drive time pending

dragon oil of sealand

the density of 400000 tons/year

maintenance on July 7

2021-7-7

plan in early August to drive

sand in tianjin

LLDPE 300000 tons/year

a temporary repair 4 days

2021-7-20

2021-7-24

long tai energy

the density of 280000 tons/year

up maintenance on July 15,

2021-7-14

plans to overhaul a month

pucheng clean energy

the density of 300000 tons/year

service

2021-7-14

plans in the near future to drive

liao tong chemical

HDPE 300000 tons/year

plan maintenance

2021-7-15

plans to overhaul 35 days

shenhua xinjiang

LDPE 270000 tons/year

overhaul since May 25,

2021-5-25

2021-7-13

Shanghai petrochemical

HDPE 250000 tons/year

the maintenance on May 30

2021-5-30

2021-7-5

China coal Montana

the density of 300000 tons/year

on July 16, overhaul

2021-7-16

plans to overhaul a month

lianyungang petrochemical

HDPE 400000 tons/year

service

2021-7-13

2021-7-27

ningxia baofeng phase ii

HDPE 300000 tons/year

service

2021-7-12

2021-7-19

CSPC phase ii

HDPE 400000 tons/year

a temporary repair 2 days

2021-7-12

2021-7-14

table 1: July China PE equipment maintenance summary

As can be seen in Table 1, in July China PE equipment overhaul enterprises are not a few, of which Qilu Petrochemical LDPE equipment originally planned to start overhaul on August 10, now due to equipment problems from July 7 to stop overhaul, driving time to be determined; Haiguolong oil full density device was originally scheduled to start parking maintenance on July 7, the original plan was only to stop for 4 days, it is still in parking maintenance, driving time to be determined. Jiutai Energy full density device, Liaotong Chemical HDPE device and Zhongmei Mengdaquan density have been repaired in the middle of the month, the maintenance period is about one month, will continue to next month.

Chinese PE device known maintenance plan in August

petrochemical name

overhaul plan

time

qilu petrochemical

LDPE 140000 tons/year

maintenance on July 7

drive time pending

qilu petrochemical

HDPE A line of 70000 tons/year

maintenance plan on August 1st

plans to overhaul 50 days

qilu petrochemical

HDPE B line 70000 tons/year

maintenance plan on August 1st

plans to overhaul 50 days

qilu petrochemical

120000 tons/year old full density

maintenance plan on August 1st

plans to overhaul 50 days

qilu petrochemical

new density 450000 tons/year

maintenance plan on August 1st

plans to overhaul 50 days

dragon oil of sealand

the density of 400000 tons/year

maintenance on July 7

plan in early August to drive

long tai energy

the density of 280000 tons/year

up maintenance on July 15,

plans to overhaul a month

liao tong chemical

HDPE 300000 tons/year

up maintenance on July 15,

plans to overhaul 35 days

China coal Montana

the density of 300000 tons/year

July 16, overhaul

plans to overhaul a month

fujian joint

the density of second line 450000 tons/year

plan on August 19, the overhaul

plan maintenance in early September to

table 2: August China PE equipment known maintenance plan

As can be seen in Table 2, in early August, Qilu Petrochemical will overhaul the whole line, the maintenance time lasts 50 days, in addition, Fujian joint full density plan from August 19 maintenance, planned maintenance to early September. The output loss of known equipment in August is expected to be about 110,000 tons, the total amount decreased by 110,000 tons compared with July. The likelihood of an increase in supply in August is increasing, and prices in the Chinese market are likely to move downward.