image

Warm Global Customers

With China Plastic Machinery

Want to visit our factory?

Polypropylene reinforced fiber anti-corrosion adhesive tape

  • Apr 10, 2025

Polypropylene reinforced fiber anti-corrosion adhesive tape is an environmentally friendly pipeline anti-corrosion tape.

Main text

Polypropylene reinforced fiber anti-corrosion adhesive tape, that is, polypropylene reinforced fiber pipeline anti-corrosion cold wrap tape, can be widely used in water supply and drainage in petroleum, natural gas, chemical industry, and urban construction, oil and gas, gas transmission steel pipelines and steel underground storage tanks for external anti-corrosion and repair projects. It uses unique polypropylene reinforced fiber as the backing material, coated with a certain thickness of high-viscosity butyl rubber modified asphalt anti-corrosion rubber, and then covered with a layer of anti-sticking isolation film.

Product advantages

Simple on-site construction and flexible construction methods;

Impact resistance, tensile resistance, high bonding strength;

Aging resistance, good UV resistance;

Non-toxic and harmless to the human body.

Technical indicators

Performance

Indicators

Test standards

Tensile strength

¡Ý60MPa

GB/T 1040-92

Peel strength

For primed steel £¾45N/cm

GB/T 2792-98

For tape backing £¾25N/cm

Dielectric strength

¡Ý25MV/mm

GB/T 1408.1-99

Volume resistivity

¡Ý1¡Á1013W¡¤cm

GB/T 1410-89

Water vapor permeability (24h)

£¼0.45mg/cm2

Heat aging resistance (2400h)

£¼25%

GB/T 1040-92

Ultraviolet aging resistance (168h)

¡Ý80%

EN 12068

Water absorption

£¼0.3%

ASTM D570-2005

Use temperature

-5-50¡æ

¡ª¡ª

Applicable temperature

-20-60¡æ

¡ª¡ª

¡¤

¡¤

Product specifications

CTB-B product width - base film thickness / adhesive layer thickness

Product width (50, 75, 100, 150, 200, 250, 300mm)

Base film thickness (0 .20mm-0.80mm)

Glue layer thickness (0.10mm-0.30mm)

¡¤

¡¤

Product use

Surface treatment: Remove rust, welding slag, burrs, oil stains, manual rust removal up to St3 level, sandblasting rust removal up to Sa2 level;

Primer application: Mix components A and B evenly, and apply with a brush or roller;

Overlap winding: After the primer surface is dry (usually 5-10 minutes), you can overlap and wrap.

Plastic Industry Video

wanplas

More Products

News

Our Latest News

Contact

Get in touch

If you are interested in our company and machine, feel free to contact our sales engineer. We will contact you as soon as possible.

Eric

Director
  • Mob: 008615950512730 (Whatsapp)
  • Email: Eric@wanplas.com
  • Address: Jiangning District, Nanjing, China

Send a request